- 1、本文档共51页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
整理完金融企业会计网上作业题
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 度注册会计师全国统一考试辅导教审计第三章.doc
- 我国注册会计师审计风险研究.doc
- 房地产行业航天置业薪酬福利管理办法.doc
- 收入费用成本和利润.doc
- 推荐注册会计师财务成本管理考试真题及答案.doc
- 招聘面试薪酬确定计划书.doc
- 扬子空调家用事业部薪酬管理与绩效考核实施细则doc.doc
- 新世纪自学考试财务管理学讲课稿.doc
- 数学建模国家财政收入的影响因素的评价及预期收入的预测.doc
- 收入费用和利润的核算.doc
- 2025年湖南省公务员录用考试《行测》题(网友回忆版).docx
- 2020年安徽省公务员录用考试《行测》试题(网友回忆版).docx
- 2025年安徽省公务员录用考试《行测》题(网友回忆版).docx
- 2025下半年省公务员录用考试第四季行测模考(浙江a卷).docx
- 2025上半年省公务员录用考试第四季行测模考(云南卷).docx
- 钢铁长城_1多媒体教学课件.ppt
- 细胞化学成分的统一性多媒体教学课件.ppt
- 2025年湖北省选调生招录考试综合知识和行政职业能力测验试卷(网友回忆版).docx
- 2025下半年省公务员录用考试第二季行测模考(浙江c卷).docx
- 2025年江苏省公务员录用考试《行测》题(A类)(网友回忆版).docx
文档评论(0)