- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浪潮财务软件gs系统客户端安装手册
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 注册税务师考试税法二预测试题.doc
- 注册税务师考试税法二全真模拟试卷中大网校3(1.doc
- 注册税务师考试精选资料税法二考试测验模拟试题(1.doc
- 注册税务师考试第二篇第八章公司法律制度.doc
- 注册税务师考试精选资料税法二考试测验模拟试题1.doc
- 注册税务师考试精选资料税法二考试测验模拟试题.doc
- 注册税务师考试第三篇第二章刑事诉讼法.doc
- 注册税务师考试税法讲义.doc
- 注册税务师考试精选资料税法二考试测验模拟试题1(1.doc
- 注册税务师考试税法二全真模拟试卷中大网校5.doc
- DB15T 2594-2022 紫花苜蓿组织培养技术规程.docx
- DB15T 2602-2022 苜蓿中咪草烟残留量的测定 高效液相色谱法.docx
- DB15T 2707-2022 库伦苦荞茶加工技术规程.docx
- DB15T 2831-2022 牧业气象观测数据质量控制 天然牧草.docx
- DB15T 2769.3-2022 有机肥与化肥配合施用技术规程 第3部分:向日葵.docx
- DB15T 2628-2022 察右中旗胡萝卜产品质量追溯技术规范.docx
- DB15T 2685-2022 “饲谷2号”种子繁育技术规程.docx
- DB15T 2661-2022 苜蓿田间主要病虫害综合防控技术规程.docx
- DB15T 2705-2022 库伦荞麦壳加工技术规程.docx
- DB15T 2706-2022 库伦荞麦粉加工技术规程.docx
文档评论(0)