- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
vdb自动餐饮售票机和自动售货机价格
『润联网』
登录【润联网】查询价格
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tol
您可能关注的文档
- dp免烫衬衫服装的选购搭配与保养new.doc
- cpf食品饮料综合自动售货机和vdb自动餐饮售票机价格.docx
- j内销电冰箱产品型号命名规则.doc
- iso表单范例采购类.doc
- kwyveo促销员手册以手机销售为例.doc
- joae双层大口径自动售货机和xy智能制冷加热饮料售卖机价格.docx
- jtb商业模式研究.docx
- lovsa度营销规划.doc
- mg跨国公司销售人员在职训练教程.doc
- kikyoll分享全球最具魅力十大步行商业街配图.doc
- 2025至2030全球及中国订单管理软件行业细分市场及应用领域与趋势展望研究报告.docx
- 2025至2030国内液晶显示屏行业市场发展分析及竞争策略与投资发展报告.docx
- 2025至2030港口设备市场前景分析及细分市场及应用领域与趋势展望研究报告.docx
- 2025至2030量子加密通信行业发展现状及投资前景战略报告.docx
- 2025至2030中国音乐合成器行业运营态势与投资前景调查研究报告.docx
- 2025至2030中国液压行业市场发展现状及竞争格局与投资机会报告.docx
- 2025至2030中国异戊橡胶行业运营态势与投资前景调查研究报告.docx
- 2025至2030帕西肽行业市场占有率及有效策略与实施路径评估报告.docx
- 2025至2030全球及中国超收敛集成系统行业细分市场及应用领域与趋势展望研究报告.docx
- 2025至2030尖齿铣刀行业市场占有率及有效策略与实施路径评估报告.docx
最近下载
- 全维状态观测器(线性系统).ppt VIP
- 5MeV电子辐照加速器剂量分布与辐射屏蔽研究.pdf VIP
- 2024年C题优秀论文亚太杯数学建模竞赛一等奖.pdf VIP
- 核电厂乏燃料贮存格架水下吊装工具研制.docx VIP
- 机器学习课后习题答案(周志华).pdf VIP
- 七年级语文上册期末考试卷(附答案).pdf VIP
- 新型工艺路线下联产哌嗪和N - 乙基哌嗪的深度探究与优化策略.docx
- 2023年西南交通大学公共课《思想道德基础与法律修养》科目期末试卷A(有答案).docx VIP
- 吉林省吉林市2024-2025学年高一上学期期末调研生物试题.docx VIP
- 武汉生物工程学院《大学英语》2021-2022学年第一学期期末试卷.doc VIP
原创力文档


文档评论(0)