EthiopianPowerSectorDevelopmentPlan埃塞俄比亚电力小企业简介

* Transmission expansion requirement….. According to system studies performed in this regard: Additional 1473km transmission lines are required. Of these 39% are 400kV, 43% are 230kV and the remaining 18% are 132kV. 15 new substations, having a total of 1850 MVA highest voltage MVA rating are required. 20 existing substation’s transformers are either upgraded to a higher voltage and MVA rating or new transformers are installed. The total transformer capacity installed at the existing substations will reach 1000MVA. About 670 MVAr new shunt capacitors at voltage levels of 400. 230 and 132kV are required in order to keep the peak hour voltage within the allowable limit. * About 152 Mvar shunt reactors at the 230 and 132kV voltage levels are required in order to control over voltage during system minimum loading conditions. The following slides will present the major transmission system expansion requirements Transmission expansion requirement….. * No. Voltage Level Transmission Line Type Length (km) Expected Year of (kV) From - To Operation 1 400 Akaki-II – Debreziet-III Single 40 2013 2 230 Debreziet-III – BDFC(Factory) Double 12 2013 3 230 Debreziet-III – Ayas(Factory) Single 5 2013 4 132 Debreziet-III – Modjo Single 12 2013 5 132 Debreziet-III – Dukem Single 8.4 2013 6 132 Combolcha – Dessie Single 127 2013 7 400 Sululta – Sebeta Single 50 2013 8 230 Sululta – Cotobie II (Legatafo), Single 40 2013 Transmission Line Additions * No. Voltage Level Transmission Line Type Length (km) Expected Year of 9 400 Beles Sululta LILO turning - Gebre Guracha , Double circuit new 400kV Transmission Line Double 3 2013 10 230 Sululta - Chanch Single 15 2013 11 230 Gebre Guracha – Fitche Single 46 2013 12 230 Fitche - Debre Tsige Single 19 2013 13 230 Ghedo Gefersa 230kV LILO – Addis Alem Double 3 2013 14 230 Addis Alem – Muger II Single 40 2013 15 132 Addis West – Black Lion Single 5 2013 16 132 Sabata I – Addis Center Single 11 2013 17 132 Addis Alem – Ginc

文档评论(0)

shaoye348 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档