- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
世界九大最难解之谜
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 《油品化验员》中级理论知识题库.doc
- 《民族理论与民族政策》复习题上.doc
- 《爱莲说》中考题——.doc
- 《环境保护知识》复习综合题选择题判断题填空题简答题名称解释题论述题.doc
- 《家政学概论》教案1.doc
- 《生命科学导论基础生物学及实验》课程考试大纲—生命科学系—寇灿.doc
- 《监理理论》模拟题补充1.doc
- 《社交礼仪概论》期末复习情景题汇集.doc
- 《社会学概论》月期末复习意见.doc
- 《申论》预测模拟试卷三.doc
- 山东省菏泽市2024届高三下学期一模考试数学试卷(含答案).docx
- 杂交生鱼繁殖技术.doc
- 湖北省武汉市部分重点高中2023-2024学年高一下学期期中考试生物试卷(含答案).docx
- 云南省昭通市昭阳区2023届九年级上学期期末综合素养阶段性评价历史试卷(含答案).docx
- 广西河池市十校2023-2024学年高二下学期4月月考化学试卷(含答案).docx
- 赤峰市第四中学分校2023-2024学年高二下学期4月月考英语试卷(含答案).docx
- 河北枣强中学2023-2024学年高一下学期第二次调研考试化学试卷(含答案).docx
- 云南省下关第一中学2024届高三上学期期中考试物理试卷(含答案).docx
- 闽侯县第一中学2023-2024学年高一下学期3月月考化学试卷(含答案).docx
- 浙江省杭州地区(含周边)重点高中2023-2024学年高二下学期期中考试政治试卷(含答案).docx
文档评论(0)