- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第二章省级共享平台相关应用系统介绍中国高等教育文献保障系统
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 第一章第二节物流发展的阶段.doc
- 笔记高二化学上第一章认识有机化合物.doc
- 稿:中小企业成本控制问题研究.doc
- 第七章企业内部控制应用指引第号企业文化.doc
- 章航空业务量预测.doc
- 第七章FANUC__i系统数控铣床操作.doc
- 第七章FANUCi系统数控铣床操作.doc
- 第七章刑法学习辅导.doc
- 第七章债券价值分析pptConvertor.doc
- 第一章:引言.doc
- 上海市宝山区2025-2026学年第一学期期末考试高三英语试卷(含答案).pdf
- 云南省普洱市镇沅县第一中学2025-2026学年高二上学期期中考试语文试题(含答案).pdf
- 天津市扶轮中学2025-2026学年高一上学期第一次月考英语试题(含答案).pdf
- 上海市杨浦区2026届高三一模英语试题(含答案).pdf
- 湖北省八校联考2025-2026学年高二上学期月考语文试题(含答案).pdf
- 山西省介休市第一中学校2025-2026学年高二上学期期中考试英语试卷(含答案,无听力原文及音频).pdf
- 江苏省无锡市梅村高级中学2025-2026学年高二上学期期中英语试题(含答案).pdf
- 山东省临沂市临沭县2025-2026学年九年级(上)期中化学试卷(含答案).pdf
- 山东省菏泽市2025-2026学年高二上学期期中考试英语(B)试卷(含答案,无听力原文及音频).pdf
- IPO审核耗时与首发股票市场表现.pdf
原创力文档


文档评论(0)