Suspended-cable Structure The allowable space deviation between the prestressed holes on the supporting members located on both the ends of the cable is L / 3000 (L refers to span), and is no more than 20 mm 钢索两端支承构件预应力孔的间距允许偏差为 L/3000 (L 为跨距),并不大 于20mm; Load-bearing cable should be arranged first and then the stable cable. The arrangement should be adjusted according to the design of the initial state of geometric surface and prestressed value adjustment, and the deviation should be controlled within 10%; 穿索时应先穿承重索,后穿稳定索,并根据设计的初始几何状态曲面和预应 力值进行调整,其偏差宜控制在 10%以内; Roof com