- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
主梁合拢段施工计划12(国外英文资料)
主梁合拢段施工方案12(国外英文资料)
The surface of concrete is covered with a double layer of cloth, and the water can be used in time. The concrete surface should be covered tightly, and the cover will be tight. The sprinkler should be continuous and should be maintained to keep the concrete surface wet. The concrete is strictly forbidden before the concrete strength reaches 2.5 Mpa.
12.5. Logistical support
The closing time shall be conducted at night, and the construction personnel shall be responsible for the arrangement of food, protection, safety management and lighting, communication and supplies.
Adequate lighting and protective equipment should be set up in places such as bridge and floor.
Winter concrete preparation
13.1, overview
According to the current construction situation, folded concrete pouring time estimates on November 18, meteorological data shows that the local average temperature of 4.1 ℃, in November in the critical state of winter construction. When the average outdoor temperature is below 5 ℃ for 5 days, or concrete pouring temperature below 5 ℃, our ministry is according to the winter construction schedule.
The key to winter construction is to control the temperature of the concrete and the insulation of the new concrete. Therefore we hot water mixing, it is proposed to extend the stirring time, heat preservation, concrete tank to speed up the casting speed, using methods and so on heat preservation material covered in time to ensure the construction quality of concrete.
13.2, main winter construction equipment and materials:
The plant is equipped with 1t coal boiler one seat, the construction site is ready for the electric heating furnace 8 and the cotton quilt.
13.3, concrete construction
13.3.1 concrete mixing
Application of protective measures: in addition to the normal inspection, before application of the approach has a strict control should be made for water content of the water content of the air to rear can code. The rain and snow cover the nigh