- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
井下工艺试题(初级)(国外英文资料)
井下工艺试题(初级)(国外英文资料)
The underground process test (primary) 180
A well control is short for the implementation of A gas well (A).
A, pressure control
B, oil and gas control
C, formation control
Early detection, (A), early treatment.
A, early shut-in
B, early kill
C, early choke
When the pressure of the well bottom pressure (C) is under pressure, the phenomenon of the wellhead return of the fluid is greater than the amount of fluid or the automatic outflow of the well after the pump stops.
A, is greater than the
B, is equal to the
C, less than
According to the position of the blowout fluid, the spray can be divided into two kinds: ground well blowout and (B).
A, drilling blowout
B, underground blowout
C, the pipe string blowout
(C) a well control technique that USES hydrostatic pressure to balance the pressure of the strata.
A, level 3 well control
B, the secondary well control
C, level of well control
The well control technique is divided into (B) level well control.
A, 2
B, three
C, four
The only correct operation to prevent the blowout is (A).
A, in time to close the well.
B, make decision according to the working conditions.
C, circular observation according to the situation shut-in.
The flow rate (C), the more convenient the shut-in control and the safer.
A, it doesnt matter
B, the more
C, the less
The secondary well control refers to the well control technology which is balanced by the timely shut-in and pressure well after the overflow or blowout.
A, the reservoir pressure
B, borehole pressure
C, formation pressure,
Shuai is A well control technique that USES (A) and the well head back pressure to balance the pressure of the strata.
A, hydrostatic pressure
B, the bottom hole pressure
C, stand pipe pressure
The root cause of the overflow is the pressure of the bottom pressure (B).
A, is greater than the
B, less than
C, is equal to the
The perforation completion method includes the casing perforation completion and (A) perforation completion.
A, tail pipe
B, tubi
文档评论(0)