- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
块石片石差别(国外英文资料)
块石片石区别(国外英文资料)
Schist, mined by blasting or wedge, is not less than 15cm thick
Stone, chunks of rock by rock or split, with square shape is roughly on the following general level off, the thickness is not less than 20 cm, width is about the thickness of 1 ~ 1.5 times the length of the thickness of about 1.5 ~ 3 times.
The bar stone is similar to the block stone, but the thickness is 7 ~ 25cm, and each side of the concave is not greater than 10mm
Phenomenon of 1.
The retaining wall is not covered by the drain, or the drainage hole is plugged up, or the drain is leaking from the wall, or the drain is leaking
It is not enough, the water in the backsoil of the wall is serious, the retaining wall is in the middle of the soil and the water, the internal force obviously increases, causing the wall to tilt
Deformation, cracking, even collapse.
2. The cause analysis,
(1) the drain hole is not required for the drawing requirement; Or hole method errors cause blockage.
It is not required to lay the water layer in accordance with the requirements of the construction specifications or drawings.
(3) there is no water slope in the inner wall of the wall, and the residual construction materials and soil uncleaned in the root of the wall.
3. Preventive measures
(1) laying a retaining wall shall be designed for drainage holes. The sleeve method is used for the discharge of the drain, and it is checked at any time
If the drain hole is open, if there is a blockage, it should be cleared or repaired in time.
(2) when the wall is backfilled, the drainage hole should be used in the drainage hole and the vicinity of the drainage area. When the design is not specified, it can be found
At the level of drainage hole, 30cm, 20cm thick gravel or pebble are used to drain the water.
(3) the roof of the retaining wall should be properly incline so that the surface water will flow to the side of the retaining wall.
4. Governance approach
(1) the water can not be ruled out after the wall, and the re
文档评论(0)