工程造价预决算中轻易漏的106项(国外英文资料).docVIP

工程造价预决算中轻易漏的106项(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程造价预决算中轻易漏的106项(国外英文资料)

工程造价预决算中容易漏的106项(国外英文资料) The sun rises and the rivers are red and the water is green like blue. Three hills and a half blue, a water divided bailu. The wind knows the strength of the grass. The mulberry garb was scattered in the spring, and the house was brought home. The tears of the eyes asked the flower not to speak, the scarlet fly over the swing. A row of holes in the insulating roof of the flat roof Embedded iron in stair railing Paint, paint construction use scaffolding Precast beam concrete: the beam seal head concrete, transportation, installation Drill-hole injection pile: drilled into the depth of the rock (the projects municipal and highway quotas are large in content) Purge of pipe installation in 6 indoor piping is easy to miss Ultra high cost for outdoor piping installation The installation of Angle steel and the cost of its main materials It is easy to miss the coefficient of the soil on the soil The artificial coefficient of foreign soil is forgotten The list of cables, wires, etc. Is only to provide the amount of net work, and it must be added in the form of reserve, bending, loss and so on The basic section is easy to leak in the distribution cabinet installation list It is easy to leak the casing in the pipe installation list The wind pipes cover the wall Adjust valve test pressure to develop temporary short control for installation. The equipment is equipped with a amortized equipment. The bolts of the flange installation in the process pipeline are unpriced materials. Installation part: the base of the higher building increases the cost of the calculation, including the total cost of the work of six floors or below 20m. When high construction and high construction conditions are met at the same time, the higher cost of high-rise buildings and the extra cost of extra high construction are added to the calculation. Ridge line, cover plate! Mostly scattered parts! It is easy to leak some small, small pieces of concrete. 21, when the roof is sewn,

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档