- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国外工程现场管理规范性文件-电气与控制系统分工界面导则
Control Systems Guide for Interface between Control Systems and Electrical
Table of Contents
Purpose
Established Interfaces
References
Attachments
1. Purpose
This guide is intended to give a description how to organize the interface with the Electrical group on projects. This guide shall be read with reference 3.1.
2. Established Interfaces
A list detailing interfaces is Attachment 2.
2.1 Power Supplies
The following information and requirements shall be communicated to the Electrical group:
voltage and type of power supply required e.g. D. C., single or three-phase AC;
number of circuits required (including spare capacity);
uninterruptable; normal/alternate mains etc.;
length of time that the supply is required in the event of a failure mains;
duration of changeover from mains to standby ( e. g. 50 m. s. ) ;
voltage regulation and tolerance;
distribution boards requirements (presentation in the form of a “key-one line” diagram is preferred);
required power in watts;
allowable voltage drop;
type of protection (fuse, automatic breaker etc.).
2.2 Alarm Systems
Full details of alarm may be provided on a form as shown on Attachment 1.
2.3 Measurement Systems
Details required may be provided by using the form as shown on Attachment 1.
Measurements shall preferably be presented by the Electrical group as isolated analogue signals of 4-20 mA.
2.4 Electric Control Systems
All process signals shall be routed into the instrumentation system (also those with no instrumentation involvement) and then those signals for electrical control passed on to the Motor Control Center.
Detailed information could be provided on a form as shown on Attachment 1.
2.5 Control and Interface Panels
Interposing cabinets can be located in instrument rooms or electrical rooms depending on project/client requirements.If mounted in electrical rooms the Electrical group is responsible for design and requisitioning. If mounted in instrument rooms the Control Systems group is responsi
文档评论(0)