Bridge Foundation and Substructure Construction Programme (k5+000 3×25m=75m Mamboleo Bridge) Basis (1) The Standard Specification for Kenya Road and Bridge Construction. (2) Contract of the Rehabilitation of Kisumu-Kakamega Road, Special Specification. (3) Drawings. (4) The General Requirement of Construction Period. (5)Actual condition in-site. 2. General Status of the Bridge we plan to commence construction of Km5+000 bridge recently. The superstructure is 3×2.5m cast-in-situ continuous “T” girder(30/20 concrete). The bridge pier and abutment of substructure is extended open cut