同层排水挂厕安装

Special curs, 2001/ Hans Slide * Flush actuator WC mounting 座便器安装 WC mounting Take out the rubber sealing rings 取出橡胶密封圈 Chisel the hole out so the pipe goes easy in 略扩孔洞尺寸以便管子容易插入 Put in the flush connection pipe and make a mark on the pipe by the end of the tile 将冲水管插到底并紧贴瓷砖面在管上作标记 Put on the rubber sealing on the flush connection pipe 在冲水管上套入橡胶圈 Put in here a photo Put on the flush connection pipe and make a mark on the pipe by the end of the WC ceramic 装上冲水管并沿座便器边在管上作标记 Put on the waste connection pipe and make a mark on the pipe by the end of the WC ceramic 装上排水管并座便器沿边在管上作标记 Put