UEA补偿压缩砼增强带施工工法(国外英文资料).docVIP

UEA补偿压缩砼增强带施工工法(国外英文资料).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
UEA补偿压缩砼增强带施工工法(国外英文资料)

UEA补偿收缩砼加强带施工工法(国外英文资料) UEA compensated contraction concrete reinforced with construction method (what ZJ had IGF - 039-95) preface In the concrete structure of the concrete reinforced concrete, the water belt is set up to prevent the crack of shrinkage and temperature difference. After pouring belt is a kind of expansion of expansion joint spacing and the effective measures to cancel the expansion joints, but after pouring construction: bring so much inconvenience to place templates and support of post-cast strip cannot be dismantled, the extended time limit, seam cleaning up trouble, bad sewing processing leaves leakage hidden trouble, etc. China building materials science research institute studied 1993 super long seamless design and construction method of reinforced concrete structures proposed replacing post-pouring joint with UEA expansion reinforcing band, to realize the structure of the arbitrary length of continuous casting, and have done many project construction practice. In recent years, six companies in China have adopted this technique, which has achieved remarkable results, and the following works are summarized according to the construction practice. The characteristics of work and law 1.1 IUEA compensation shrinkage concrete reinforcing band, large dosage of UEA because of high inflation, set in the cast-in-place reinforced torsion structure shrinkage stress of the largest, and the structure of the concrete pouring to be done at the same time. After the removal, the construction is easier. 1.2 during the construction of cast-in-place reinforced concrete structure, using UEA shrinkage compensation strengthening belt will just sound partition panel structure, to compensate to strengthen with the contraction of ortho structure, to control the shrinkage cracking of the base. 1.3 in the floor of underground waterproof structure, wallboard structure or structure, floor, waterproof construction, the waterproof construction of roof structure, to improve th

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档