- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
南水北调中线工程地理信息数据采集(国外英文资料)
南水北调中线工程地理信息数据采集(国外英文资料)
Use the full digital photogrammetry system to produce 1:20 scale DLG products. Using stereoscopic images to collect data, the principles of operation are as follows:
(1) according to the principle of the external industry and the positioning of the inner industry, the reference is to carefully and carefully identify and map all kinds of ground and geomorphological elements in the three-dimensional model.
(2) the surveying and mapping of the ground objects and the elements of geomorphology shall be cut and drawn, without distortion or shift. The ground objects, which are denoted by the scale of the scale of the earth, shall not be cut to the site or position line.
(3) the priority shall be the independent land, industrial and mining buildings and public facilities which have bearing and economic significance.
(4) the elements of water system are the main points of surveying and mapping of the topographic map. The river water line is collected by the two lines, and the water level of the pothole, reservoir, lake and other parts of the water are mapped by the water level, water well, spring, etc. The main lines of the Central Line need to be highlighted, according to the three-dimensional surveying and mapping of the construction of the project.
DEM data production
Digital elevation model (DEM is engineering design and construction, the computation, storage capacity calculation of quantities, the three-dimensional geographic information environment construction of basic information, DEM is of great significance to the construction of quality and precision. Using the full digital photogrammetric system, the DEM data of the typical channel segment of the middle line project is produced.
(1) basic requirements
-- the DEM network is small: 1m by 1m;
-- DEM high accuracy: the error is not greater than 2/3 of the height of the grid.
-dem edge accuracy: the adjacent DEM side will not be budged, the adjacent row (column) grid point plane coordinates s
文档评论(0)