主拱圈浇注方案(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
主拱圈浇注方案(国外英文资料)

主拱圈浇注方案(国外英文资料) The main arch ring concrete casting construction plan First, the general situation of the project The wangjijia river bridge is located in the youth east road of yueyang city, which is (35 + 50 + 35) m 3 cross-reinforced concrete box arch bridge, the bridge center pile number K1 + 578.5, the bridge width 35m, the length 168.188 m. The reinforced concrete box arch is a single-case multi-chamber arch, which is the solid section of the shaft of the arch in two meters. Two meters apart, the sides are separated into seven compartments by one meter and 0.5 meters respectively, separated by one meter and 0.5 meters respectively, and separated into 10 Chambers. Second, the main project quantity The number of concrete projects in the main arch is 3832m? ; The main arch is 890t. Three, the construction plan, the method (1) construction plan: According to the design of the construction and the actual construction of the site, the scheme of the casting of the layered section along the axis of the arch axis is proposed. Each arch is divided into three sections along the main arch axis. The first paragraph is the arch of the arch to the nearest wall of the arch. The second paragraph is near the arch and the nearest wall to the other side of the wall; The third paragraph is the symmetry of the wall to the other. A total of 2 places will be set and the width is 80-100cm. Using commercial concrete, concrete pouring sequence is: the backplane, web plate and diaphragm post-cast strip, roof, symmetrical pouring construction, arch foot 2 meters solid abdomen section of a casting molding. Note: the above near arch is recently erected in the wall of the vertical wall and the arch of the abdominal arch, which is 3 #, 4 #, 8 #, 9 #, 13 # and 14 #. (2) construction methods: After preloading, the bottom of the main arch bracket die on the bottom die to re-mark bridge, the central axis plane position of box girder lofting, marked on the bottom die clapboard, the lateral abdomin

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档