信访大楼砌块墙体抹灰质量控制2(国外英文资料).docVIP

信访大楼砌块墙体抹灰质量控制2(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
信访大楼砌块墙体抹灰质量控制2(国外英文资料)

信访大楼砌块墙体抹灰质量控制2(国外英文资料) Jiangxi provincial construction engineering co., LTD The project department of the provincial letter and visiting building Gas concrete block wall plaster Mass control system Writing: zhang jianxin Jiangxi provincial construction engineering co., LTD In December 2009. catalogue First, the general situation of the project Second, a brief introduction to the group Third, the reason of the selection The status investigation and the activity target value are determined Cause analysis and determination of the cause Sixth, formulate countermeasures The countermeasures are carried out 8, effect check Ninth, consolidation and consolidation measures Summarize and plan First, the general situation of the project The construction project of jiangxi provincial peoples visiting reception center is located in yangming east road of nanchang city, with the shape of an L shape and an underground layer. The main building on the ground is 9 floors, skirt building 3 floor. The height is 3.6 m. The total height of the building is 42.9 m. The total floor area is 10121 m2. This project is a frame structure with 190 thick porous brick walls. The inner wall is 190 thick concrete blocks, with M5.0 mixed mortar masonry. Inside metope is main for high-grade coating metope. The exterior wall is dry hang granite and coating coating. Construction began in October 2007 and was completed in late 2008. The quality objective of this project is a provincial one, and it has now been reviewed through the provincial azaleas prize. Second, a brief introduction to the group Team members are made up of technical, quality, construction and crew members. Group name The provincial people visit the center building project department QC group A time In April 2008, Project name The cracks in the wall of the reinforced concrete block are controlled Project type Site management The activity time 2008 3 ~ 12, 2008 Number of activities Eight times attendance 97% Group members: The serial numbe

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档