吊车梁施工方案(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吊车梁施工方案(国外英文资料)

吊车梁施工方案(国外英文资料) Figure 3: assembling the location diagram Welding process requirements Selection of welding equipment and welding materials The crane girder steel is Q235B, the steel plate butt seam and the t-shaped arc automatic welding welding (MZ1000), dc reverse, the choice of H08A wire and HJ402 welding agent; Manual welds adopt E4315 electrode. 6.2 position welding When the plate is docked, the welding position of the weld at the back of the initial pass is welded. When assembling the crane girder, the welding seam is used for welding welding. Position weld length, thickness and spacing require the following table: Joint form Weld length/mm Weld thickness/mm Weld spacing/mm Plate butt 20-30 5 500-500. T joint 80-80. 8 400 Welding process parameters of 6.3 arc welding Joint form Pass sequence Wire diameter mm Welding current a. Welding voltage V Welding speed Cm/min Stem elongation mm Plate butt The delta 14 The first layer 5 400-400. 31-32 44-46 30 to 40 The delta 25 The first layer 5 500-500. 31-32 44-46 30 to 40 The second floor 5 500-500. 32-34 44-45 30 to 40 T joint The first layer 5 500-500. 31-32 44-46 40-45 The second floor 5 500-500. 32-34 44-45 40-45 The operation requirement of the submerged arc welding Before the arc welding, if the interface has clearance (greater than 1mm), the thin layer of welding on the back of the initial welding layer should be applied by manual arc welding. Position weld and hand welding temporary sealing weld shall be cleaned before the initial welding and avoid the unsoldering. Before welding, first of all, should adjust the car track parallel to the center line of the groove, and the distance in the range of the nose lateral adjustable, and let the car empty run in the groove center line, can enter the normal welding. When welding, the arc and arc of arc must be in the lead, stop arc. The direction of the welding process is always in one direction. Prior to welding, the first layer of weld shall be cleared. After the cove

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档