- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吊车梁施工方案(国外英文资料)
吊车梁施工方案(国外英文资料)
Figure 3: assembling the location diagram
Welding process requirements
Selection of welding equipment and welding materials
The crane girder steel is Q235B, the steel plate butt seam and the t-shaped arc automatic welding welding (MZ1000), dc reverse, the choice of H08A wire and HJ402 welding agent; Manual welds adopt E4315 electrode.
6.2 position welding
When the plate is docked, the welding position of the weld at the back of the initial pass is welded. When assembling the crane girder, the welding seam is used for welding welding. Position weld length, thickness and spacing require the following table:
Joint form
Weld length/mm
Weld thickness/mm
Weld spacing/mm
Plate butt
20-30
5
500-500.
T joint
80-80.
8
400
Welding process parameters of 6.3 arc welding
Joint form
Pass sequence
Wire diameter
mm
Welding current
a.
Welding voltage V
Welding speed
Cm/min
Stem elongation
mm
Plate butt
The delta 14
The first layer
5
400-400.
31-32
44-46
30 to 40
The delta 25
The first layer
5
500-500.
31-32
44-46
30 to 40
The second floor
5
500-500.
32-34
44-45
30 to 40
T joint
The first layer
5
500-500.
31-32
44-46
40-45
The second floor
5
500-500.
32-34
44-45
40-45
The operation requirement of the submerged arc welding
Before the arc welding, if the interface has clearance (greater than 1mm), the thin layer of welding on the back of the initial welding layer should be applied by manual arc welding. Position weld and hand welding temporary sealing weld shall be cleaned before the initial welding and avoid the unsoldering. Before welding, first of all, should adjust the car track parallel to the center line of the groove, and the distance in the range of the nose lateral adjustable, and let the car empty run in the groove center line, can enter the normal welding. When welding, the arc and arc of arc must be in the lead, stop arc. The direction of the welding process is always in one direction. Prior to welding, the first layer of weld shall be cleared. After the cove
您可能关注的文档
- 04年一级建造师建筑工程经济真题及答案(国外英文资料).doc
- 11路面纵、横缝顺直度检查表(国外英文资料).doc
- (建筑工程)第1、3章(国外英文资料).doc
- (判断题)作弊版1(国外英文资料).doc
- 160 知识(国外英文资料).doc
- 16秋北交《公路工程》在线作业1(国外英文资料).doc
- 16秋北交《城市轨道交通牵引电气化概论》在线作业一(国外英文资料).doc
- 16秋北交《施工组织与概预算》在线作业一(国外英文资料).doc
- 16秋北交《施工组织组织设计与概预算B》在线作业一(国外英文资料).doc
- 163531_脚手架计算规则(国外英文资料).doc
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷最新.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷完整版.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷学生专用.docx
- 新行业解决方案-口腔行业清洗报告.pptx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷含答案.docx
- 2025年湖南高尔夫旅游职业学院单招综合素质考试题库及答案一套.docx
- 2025年湖南食品药品职业学院单招职业适应性考试必刷测试卷完美版.docx
- 2025年湖南高尔夫旅游职业学院单招综合素质考试题库参考答案.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性测试题库及参考答案1套.docx
- 2025年湖南食品药品职业学院单招职业适应性测试题库及答案一套.docx
文档评论(0)