建筑管理(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑管理(国外英文资料)

建筑管理(国外英文资料) Prohibited mark (no thoroughfare, forbidden parabolic, etc.), warning signs (beware of falling objects and be careful to fall, etc.), electrical safety sign (prohibit closing, be careful with electricity, etc.) and indication marks (safe passage, fire, theft alarm, emergency telephone, etc.). (4) the main transportation routes are to be set up in a circular manner or in the position of the vehicle to make sure the road is smooth. (5) conditions of the road may be used for concrete road surfaces, and other hardened surfaces may be adopted unconditionally. The ground should also be hardened to avoid dust and mud after rain. The construction site must have good drainage facilities to keep the drainage open. (7) the construction area, the office area and the living area shall be set up separately, keep the safe distance and set up the sign. The office and living areas shall be greening according to the actual conditions. (8) all kinds of temporary facilities shall be arranged according to the general plan of the construction and shall be neat and beautiful. Office and living in temporary facilities appropriate USES light body heat insulation or heat insulation trailer, can repeatedly use, reduce the cost of temporary set can achieve the result of neat and beautiful again. (9) the construction site temporary electricity line arrangement, must meet the requirements of the installation specifications and safe operating procedures in accordance with the construction organization design for erection, do not stay by electricity. And there must be night lighting that ensures the construction requirements. (10) construction of waste water and mud flow water tank or pipe flow to the construction site shall be collecting basin precipitation process, shall not be arbitrarily emissions and pollution construction area outside of the river, the road. How to carry out the construction site safety protection arrangement? According to the relevant regulations on constructio

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档