构造物台背回填(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
构造物台背回填(国外英文资料)

构造物台背回填(国外英文资料) Xiamen to chengdu national highway ganzhou to chongyi (gan xiang) section B5 contract segment (K514 + 000 ~ K518 + 150) Special construction plan for the back of the counter China railway bridge north engineering co., LTD The department of the B5 contract section of the jiangxi highway Backfill construction plan for construction platform The purpose of the backpacking of the construction platform Bridge opening Taiwan back uneven settlement is the quality common fault of highway construction, in order to ensure the construction quality of construction platform back backfill, avoid phenomenon of vehicle dumpping on later, according to the bidding document template (2009 edition) requirements of technical specification article 204.04.9, formulates this special construction scheme. Second, the writing basis Technical specifications for highway construction (jtj033-95) Testing procedures for highway earthwork (jtj051-93) Evaluation criteria for quality of highway engineering (jtgf80/1-2004) Key points for quality control of highway construction in jiangxi province Third, construction preparation (1) personnel organization According to the specific characteristics of the blocks, forming jiangxi high speed B5 contract period of the project intends to, 1 project intends to set up a project manager, chief engineer 1 person, vice manager. Sets: engineering, security, contract department, the department of department, finance department, integrated office, laboratory, testing group, form an organic whole, complete platform back backfill construction tasks. (2) the configuration of mechanical equipment According to the situation of the construction site and the requirement of the contract, the corresponding mechanical equipment shall be organized. The equipment has been carefully maintained to ensure the requirements of construction. The equipment of the entry equipment check list is in good condition, and all the repair parts are in place. (3) measures prepara

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档