- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《修建工程定额与预算》第05章在线测试(国外英文资料)
《建筑工程定额与预算》第05章在线测试(国外英文资料)
Building engineering quota and budget chapter 05 online testing
? Building engineering quota and budget chapter 05 online testing
Remaining time:
when
The top of the form
? 1, this volume is 20 points out of 20.
??????????????? After you finish the question, please make sure to click the hand in hand button, or you will not be able to record the results of the paper.
??????????????? Dont refresh the page before you hand it in, otherwise your answer will be empty.
1, 1, 1, 1, 5, 5
? 1, () is to complete the project construction, occurred in the project before construction and construction technology, in the process of life, safety, health, environment and other aspects of the non-engineering entity project.
A, organizational measures
B, the technical measures project
C, measure project
D and other projects
? For example, if the owner supplies a piece of material or is paying a fee, the cost of the materials or fees shall be deducted from ().
The construction cost of A and after tax
B, pre-tax engineering cost
C, the cost of construction project
D, indirect cost
? The calculation base of housing accumulation fund is ()
A, labor
B, comprehensive man-days
C, direct fees
D, pre-tax cost
? The calculation base of accident injury insurance is ()
A, labor
B, comprehensive man-days
C, direct fees
D, the project cost
? Where the tender documents do not agree with the bid documents of the winning bidder, they assume ().
A, the tender documents
B, the bidding documents
C, the contract
D, negotiate
Problem 2, multiple choice questions (2 points for each question, 10 points for 5 questions)
? The fees for the comprehensive unit price (2008) of the construction project of henan province is made up of ().
A, the cost of project pollution
B, the fee for measuring the project
C, social security (endowment insurance, unemployment insurance premium, medical insurance premium)
D, housing provident fund
E, accidental injury insurance premium
? The following c
您可能关注的文档
- 600 MW超临界锅炉低NOx轴向旋流熄灭器(国外英文资料).doc
- 2011年10月自考《心理心思学》必背常识6(国外英文资料).doc
- 《水工修建物》1(谜底)(国外英文资料).doc
- “汉十六字砖”的书法价值(国外英文资料).doc
- 你疯了,脑袋进水了,用英语如何说?(国外英文资料).doc
- 一条网线接两台电脑2(国外英文资料).doc
- 什么是承载式车身和非承载式车身(国外英文资料).doc
- 供水管道标准(国外英文资料).doc
- 修建施工技巧自测试题3(国外英文资料).doc
- 健步行走有十二种惊人疗效(国外英文资料).doc
- 初中历史课程资源知识图谱构建与历史研究能力培养研究教学研究课题报告.docx
- 初中历史教学中的历史事件因果关系分析:生成式AI在历史事件因果关系分析中的应用教学研究课题报告.docx
- 高中历史教育:微型垂直农场系统构建与古代农业技术传承教学研究课题报告.docx
- 文化遗产保护教育在中学生公民意识培养中的实践研究教学研究课题报告.docx
- 初中计算机教育数字资源开发中的版权保护与合规性研究教学研究课题报告.docx
- 高中语文革命题材教学中的情感教育策略分析教学研究课题报告.docx
- 国家智慧教育云平台对贫困地区教师培训的精准扶贫作用研究教学研究课题报告.docx
- 小学美术数字教育内容版权保护与合规性实施路径研究教学研究课题报告.docx
- 《商业银行信用卡风险防范中的风险信息共享与协同机制研究》教学研究课题报告.docx
- 《航空航天领域3D打印技术关键材料研究与应用进展分析》教学研究课题报告.docx
文档评论(0)