东财11春学期《施工技巧》在线功课(随机)9(国外英文资料).docVIP

东财11春学期《施工技巧》在线功课(随机)9(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
东财11春学期《施工技巧》在线功课(随机)9(国外英文资料)

东财11春学期《施工技术》在线作业(随机)9(国外英文资料) Construction technology online assignment 5 (random) Test scores: 100 test time: - test scores: 78 Multiple choice of choice questions One, single topic (total 15 questions, 60 points). The score: 48V 1. Tensioning should have the following properties: a. self-locking and self-stabilization Self-anchor and self-marketing C. self-anchor and self-locking D. self-locking and self-selling 4 points: 4 Sand pulp should be used in sand B. medium sand C. coarse sand 4 points: 4 When using A hammer to sink A pile, to prevent the pile from being damaged by excessive stress, the stress requirement: () A Bob Hammer blow sledgehammer 4 points: 4 Which of the following is not the construction method of the concourse: () A B. Buried corrugated tube method C. asphalt hemp The pipe core method 4 points: 4 5. A groove excavation earthwork, natural ground level of 0.8 m, base elevation of 4.8 m, basal 4 m wide, base 8 5 m, was elected with 6 m long well point pipe, delta h is (). A. 0.30 ~ 0.66 m B. 0.385 ~ 0.66 m C. 0.30 ~ 0.66 m D. 0.5 ~ 1.0 m A full score: 4 Stone masonry must be set in stone, should be distributed evenly, usually at least every 07m2: () A B. two pieces of C. three pieces D. Is determined by the strength of the wall A full score: 4 The following statement on the quality control of the pile is incorrect: () a. the penetration control is based on the hardness of the soil layer B. When the soil layer is soft at the tip of the pile, it is controlled by penetration C. The tip of the pile is hard on the soil, and the height control of the pile tip is the reference D. When the soil layer is soft on the tip of the pile, the design of the pile tip is dominated by high control A score of 4 points: 0 The whole input of raw materials is discharged B: were going to start loading the material at the beginning All the raw materials are put into the beginning D: were going to start loading all the material 4 points: 4 9. About the piles of the follo

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档