地下室剪力墙施工计划(国外英文资料).doc

地下室剪力墙施工计划(国外英文资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地下室剪力墙施工计划(国外英文资料)

地下室剪力墙施工方案(国外英文资料) Basement shear wall construction plan 1, engineering overview The building is divided into sections A and B, all set up in the basement. Basement wall For shear wall, shear wall thickness is divided into 350mm, 300 mm, 250 mm, 200 mm. The concrete strength grade is C35, and two rear water belts are set up, according to the following, the construction is divided into A, B, C and three sections. The anti-permeability rating is S6. The shear wall concrete structure is 410M3. Schedule 2 The basement shear wall concrete casting plan was set up on October 11, solstice12, the section of A section, October 14-15, the B section, the October 20-21, the section of the C section, and the plan to cast 80M3 every day and night. It will take five days to complete the entire pouring. Construction plan Consider the driving and parking locations of automobile pumps and concrete transports as follows: When casting A shear wall of A, the car pump is parked inside the front door of the construction site, and the concrete transporter is coming in and out of the factory gate. The car pump is parked in the inside of the door when the car pump is in the outside of the door. 3.3, pouring shear wall, consider car pump and pump combination, at the same time operating casting drag pump park gate inside the construction site, concrete truck from the factory gate to gate at the site. 4, construction preparation, Prepare the scene 4.1.1 shear wall steel construction finished, and the inspection engineer is qualified. After 4.1.2, the water belt shall be welded, fixed and firm, 4.1.3 shear wall to check and check and check The construction water will be connected to the construction site 4.1.5 construction electricity should be equipped with the power supply according to the general plan, and should be equipped with four mobile three-level distribution boxes, which can be used at the same time for six vibrators. The site should be equipped with a backup diesel generator with a p

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档