- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
培土路肩、中间分隔带回填土、土路肩加固及路缘石水工(国外英文资料)
培土路肩、中央分隔带回填土、土路肩加固及路缘石水工(国外英文资料)
Section 1: the shoulder of the soil, the central dividing belt, the backfill of the earth, the shoulder reinforcement and the road
The scope of
The work of this section includes the backfill soil of the road shoulder and the central dividing belt, and the construction of the soil and shoulder reinforcement.
material
The materials used for the backland and the central separation zone shall conform to the drawings and the requirements of the standard 204.02.
Cement concrete shall conform to the drawings and the requirements of section 410 of this specification.
The mortar shall conform to the drawings and the requirements of section 413 of this specification.
Construction requirements
After the paving of the road, the construction of the road shoulder and the central separation zone shall be completed, and the drawings and supervisory engineers shall indicate the construction work.
The construction technology and requirements for the backfill soil of the road shoulder and the central dividing belt and the requirements of the standard 204.04 are in accordance with the requirements of the drawing.
The surface shall return to the soil in accordance with the instructions of the drawing or supervision engineer.
Prepare for your shoulder straps
(1) to measure the height and width of the construction before construction, when the drawing is not in conformity with the requirements of the drawing, it shall be trimmed in time; The compaction of the soil shoulder should meet the above 95% of the heavy hitting standard, and the roadbed changes should meet the drawing requirements.
(2) the construction of prefabricated blocks or concrete reinforced concrete work should be done by the supervision engineer for examination and approval.
Concrete prefabricated block to reinforce the dirt shoulder
(1) the size of the concrete precast blocks according to the drawing requirements should be in prefabricated prefabricated centrally, and after inspection q
您可能关注的文档
最近下载
- 中学地理学科课程标准与教材研究教学大纲.pdf VIP
- 中建X局各类建筑工程技术经济指标.docx VIP
- 我们的手上有多少细菌?.doc VIP
- 第一单元 观察物体 大单元教学设计2025数学人教版三年级上册(新教材).pdf
- 年东北财经大学国际商学院(校本部) 联招联考项目招生指南.pdf VIP
- 驾驶员安全生产操作规程 - 生产安全.docx VIP
- 公务员(国考)之行政职业能力测验题库附答案(基础题)收藏.docx VIP
- 全册部编版六年级上册全册道德与法治教学课件.pptx
- 第二章-空气流动压力及阻力.pptx VIP
- 2025年全国农产品质量安全检测技能竞赛理论知识考试题库(含答案.docx VIP
文档评论(0)