川大《修建施工技巧(ⅰ)1411》13春在线功课2(国外英文资料).doc

川大《修建施工技巧(ⅰ)1411》13春在线功课2(国外英文资料).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
川大《修建施工技巧(ⅰ)1411》13春在线功课2(国外英文资料)

川大《建筑施工技术(ⅰ)1411》13春在线作业2(国外英文资料) Sichuan construction technology (Ⅰ) 1411 13 spring online homework 2 In the fall of 14, there is a total of test scores: 100 test times: Single topic selection Multiple choice (30 questions, 60 points.) The virtual work in the double code network diagram A: that is time consuming and resource consumption B. it only takes time and no resources It doesnt waste time, it doesnt waste resources Dont waste time and resources Full marks: 2 The two floors of the masonry wall are not less than the same A. A 30 mm B. 60 mm C. 90 mm D. 120 mm Full marks: 2 The main function of the bark is Control level B. stay C. control verticality D. determine the floor of the room Full marks: 2 The following description of the flash butt welding process of the steel bar is incorrect A continuous flash butt welding applies to smaller steel bars Preheat flash welds apply to flat, flat steel bars C. flash preheat flash welding is applied to the uneven steel bar in the end D. can be divided into two kinds: overlap welding and groove welding Full marks: 2 In the execution of the project network plan, if a non-critical work is delayed by the actual schedule, it is more than the total time difference The computation period of the network plan will not change The total time difference of the job is the same C. the free time difference of the job D. the key line changes in the network plan Full marks: 2 The working hours of a professional team in a construction segment A. B. the construction period Water beat D. the construction period Full marks: 2 Total jet lag A. it does not affect the operating time of the working procedure as early as the beginning The operating time of the work is not affected by the delay of the operation C. does not affect the operating time of the work period D. does not affect the operating time of the work Full marks: 2 The shortest way of working in the construction of a project is In turn Parallel construction Flow construction Full ma

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档