新老路基搭接施工8(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新老路基搭接施工8(国外英文资料)

新老路基搭接施工8(国外英文资料) The Cambodian national 59 highway reconstruction project construction technical disclosure Attachment 8 new old roadbed construction technology to meet the base 1, the construction method, Excavator on new fill subgrade of old subgrade slope on the surface soil to clean up, on the same slope up the steps, step width to the width of the side slope digging, generally not less than 1 m wide. The slope is 4 percent, and the slope rate is 4 percent. At the step of the step, cooperate with artificial spread flat, must make the step contact surface is not floating, the line is flat, the interface is clean. To run the roadbed with the roller, and the compaction procedure complies with the rules of the earths road foundation. Steps of compaction, the steps on the earth, and a large new subgrade compaction, in conjunction with patch on the touchline, due to the inconvenience, roller compaction, no artificial fill with hydraulic vibration rammer; Make it as compacted as the new roadbed. To test the compactness in the method of irrigation; Inspection, except by normal standard test compaction, plus offset point on the stairs, on the steps of compaction control standards in line with the same height of the new roadbed. In the final layer of the road bed, the earth machinery of the shoulder part of the road first flattens, and then the artificial level of the earth, and then the compaction is compacted. 2, quality measures With the original roadbed lap is related to the quality of the original roadbed, also relates to the quality of the new roadbed, so the steps, must make to the original position of the subgrade compacted soil, real-time, along with a right roadbed compaction; In particular, we should draw the spot on the step to test the compaction quality. 3, roadbed repair In this project, the subsection of the road foundation includes the following contents: the road bed is flat, compacted and the slope is trimmed. The soil and embankment slopes are direct

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档