- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
梁板柱模板交底(国外英文资料)
梁板柱模板交底(国外英文资料)
This is a record
Table C2-1
Make no.
The name of the project
New hainan east ring railway boao railway station station and related project
Date of disclosure
On November 15, 2009
Construction unit
China railway construction group co., LTD., the project department of hainan railway station
Project name
Template engineering
Clarificaiton feed
Quality standards and technical requirements for the installation of beams, plates and columns in A
Content of the disclosure:
1, main materials and tools
Multilayer board: 1220mm by 2440mm by 15mm. Wood square: 10 cm by 10 cm; Tube shelf: Ф 48 x 3.5 mm (Q235) steel pipe; Clasp: cross, butt, and swivel. Wear a wall: A16 times 1200, A16 times 1500, A16 by 1700. Circular saw, hand saw, drilling, chalk, ruler, pendant, crowbar tool etc.
Construction preparation:
2.1 reinforcement have finished tie beam, plate, column, steel protective layer block has finished binding, (column, the board of reinforced protective layer of 45 mm respectively, 30 mm, block spacing is 450 x 450 torx decorate, beam steel protective layer for 45 mm, block spacing is 500 mm or less) and reinforced has hidden formalities;
2.2 steel structure and water, pre-installed and installed,
The surface of the shaft must be cleared of the float and the shaming, the rubbish and the clutter have been cleaned up.
The 2.4 beams, plates, posts and control lines have been bounced and checked.
Operation technique:
3.1 column template installation:
Process flow: the position line of the projectile, the mounting column, the mounting column, the precheck
3.1.1 elastic column line of position: the workers have been using theodolite is measured by the project measure column template installation line, personnel is measured by the carpenter team according to the project department is given template line, in the concrete foundation bearing platform release template (200 mm) line;
3.1.2 mould installation: in the wood processing area, blanking of column template, and
文档评论(0)