- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
练习须知(国外英文资料)
实习须知(国外英文资料)
(5) foundation
The base selection type adopts the independent basis, the base level is -5.10 M
The base floor of the steel bar should be the 100 thick layer of the C10, which is 100 on each side of the foundation
3. The thickness of reinforced foundation, there are pad 40, there is no cushion in 70, with direct contact with the outside building waterproof of reinforced soil retaining wall, column in the part of the ground outside protective layer thickness should be increased to 40 outward.
(6) ground
Formation soil description: the base should be set on the undisturbed pebble bed, the bearing capacity of F = 350KPa
The base tank inspection shall be carried out according to the engineering geological survey report and the construction drawing, and the inspection and design personnel shall be required to participate.
When the infrastructure is finished, the ground of the gobi, which has an erosion effect on the base, has been refilled in gravel and soil.
4. The foundation excavation should be stipulated in the blasting engineering construction and acceptance standard and put slope, influential to adjacent building foundation pit, should do by has the design and construction of rock units supporting design and construction.
(7) preparation for construction
Basic work before template installation:
1) pay-off: first putright construction side column, wall axis, flat as a starting point to the axis, which leads to the various axis. Template pay-off, according to the center line of the construction drawing with chalk line pop-up template and sideline, wall template will popup template edges and the lateral line, so that the template installation and calibration.
2) use a level of water level to set the level of the building in accordance with the requirements of the actual elevation, and direct it to the position of the template.
3) the bottom part of the template should be made up in advance and the clutter should be cleaned up to ensure that the template p
您可能关注的文档
最近下载
- 中国云新南航空公司acars系统培训.ppt VIP
- 马克思主义宗教观87814.ppt VIP
- 《城市轨道交通通信与信号》教案 第11课 城市轨道交通通信系统(一).docx VIP
- 大众蔚领保养手册.docx VIP
- 部编人教版小学4四年级语文上册(全册)优秀教案设计.doc VIP
- 道德与法治新教材培训心得体会.pptx VIP
- 2026年高考化学大一轮复习第3讲离子共存 离子的检验与推断.pptx VIP
- 冯唐成事心法读书札记.docx VIP
- 第1课 时代精神的精华-【中职专用】2024年中职思想政治《哲学与人生》金牌课件(高教版2023·基础模块).pptx VIP
- 《新闻采访与写作》电子课件 第三章 新闻采写的客体——新闻事实.ppt VIP
文档评论(0)