- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
模拟试题(二)(国外英文资料)
Simulation exam (2)
One, a single choice question (60, 1, 60 points, each of which is the only one that fits the question)
Construction units shall commence on the time of receiving the construction permit, and the starting period shall be within a month of the date of receiving the construction license.
A. 1 b. 2 c. 3 d. 6
The bidder may, in (B), supplement, amend or withdraw the submitted bid documents and notify the tenderer in writing.
A: the tenderer shall issue A bid document before the deadline for submission of the tender documents
C. begin before the evaluation
The validity period of the initial registration of the cost engineer is (C) year.
A. two b. three c. four d. five
The following statement about the construction cost consultancy business is correct (A).
A. A company can undertake business in the whole country
C. Class b enterprises can engage in the construction cost of RMB 30 million for the construction project cost advisory business
Class a enterprises may engage in the consulting business of construction projects of RMB 30 million or more
In the following statement on the concept of project management, the error is (C).
The three objectives of project management include the time, cost, and quality of the project
C. project management has the characteristics of repeatability and repeatedly, d. project management has the characteristics of target, systematic, procedural and scientific
The proposed unit of the proposed project to the state for the purpose of building an engineering project is (A).
A. project proposal b. c. feasibility study report the design plan descriptions of the d. project report
In a construction project, there are independent design documents, and the project that can independently produce the production capability or project benefit independently is known as (C).
B. a. branch engineering component project c. single items of projects as A d. unit project
The method of controlling the project schedule and the co
您可能关注的文档
最近下载
- 慢性鼻炎中医治疗PPT大纲.pptx VIP
- 2012年度证公司会员经营业绩排名情况.doc VIP
- 2025年最新人教部编数学七年上册全册知识点梳理、归纳 (2套)初一数学期末总复 .pdf VIP
- 智能客服:客服机器人优化_(1).智能客服基础理论.docx VIP
- 小儿感冒的中医内科治疗方法.pptx VIP
- 智能客服系统智能客服系统智能客服机器人智能客服机器人性能优化方案.docx VIP
- Geely Galaxy M9吉利Galaxy M9-2025欧洲车身会议.pdf VIP
- 二手手机交易信用风险预警分析报告.docx
- 2013年度证券公司会员经营业绩排名情况.docx VIP
- 建筑的幕墙工程施工.ppt VIP
原创力文档


文档评论(0)