- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(甲板)挖泥操作(国外英文资料)
(甲板)挖泥操作(国外英文资料)
Operation procedures for dredging operators
The excavators shall strictly observe the rules of this operation:
First. The basic rules
The dredge operator must be centrally manager and carefully operated during the value period.
Check and refueling during the excavated construction period, check the status log.
After stopping the dredging, check the dredging equipment such as bridge, winch and steel pile, and check for the log.
Maintain effective and timely contact with crew or other personnel on board.
Keep an eye on the sea surface and notice the safety of the ship and line.
Actively cooperate with the demolition and repair work of the Marine department.
Two. The operation of the dredging control platform
Observe the indicator value of the production meter, and control the flow rate and concentration according to different conditions.
Observe the hydraulic pressure indicator to understand the state of the hydraulic units. If there is any abnormality, the reason should be examined in time.
Observe the pressure indicator of the mud pump and pump to understand the pump status.
Pay attention to the alarm. In case of alarm, press the accept alarm button first. After reading the contents of the alarm, press the accept click button. The above operation will be repeated for every alarm call, and the engine room personnel will be notified immediately.
The action master and the secondary steel pile must wait for the corresponding indicator light (or extinguish) to proceed to the next step.
Before the free-fall, the steel pile fixture must be fully open.
When two piles are landed, it is absolutely not allowed to swing a dredger.
The cable sometimes relaxes when the cable is loose. If the anchor is likely to swing forward, it must relax the cable so that it is greater than the length of the insurance cable.
When the windlass is used, the anchor winch must be placed in the free spring position before the windlass is used.
The speed control knob of the anchor a
文档评论(0)