- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
500t级油船船体说明书(国外英文资料)
500t级油船船体说明书(国外英文资料)
`
The 500 - ton oil tanker
tag
The number of
Modify the number
Sign a word
Day period
Hull specification
VCK765 sm - 100-01
Compiling system
A word
The school of
The reviewer
With a total area of
M2
A total of eight pages
Page 1
On the
Review on
Day period
1. An overview of the
1.1 purpose
This ship is sailing in the middle and lower reaches of the Yangtze river of motor for oil tankers, trading for A, B, carrying the flash point greater than 60 ℃ (closed cup test) of light diesel oil and 1500 s under fuel oil.
Specifications and rules
The ship shall comply with the following specifications and rules, including any amendment to the rules and regulations that shall be implemented prior to the approval of CCS.
(1) the construction regulations of the steel inland waterway (2009) China classification society
(2) China maritime bureau (2004)
(3) the China maritime bureau (2007, 2008)
1.3 the general picture of the vessel
The ship has an inclined stem, a regular stern and an efficient fishtail rudder, with an arc on the forecastle deck and a raised deck in the bow. The engine room, the accommodation space and the cab are all set in the stern, and the cargo tank is located in the midship.
The ship is a steel welded ship, and the cargo oil tank is structured as a single bottom double side, and the rest is single-sided. A tanker is a single-deck, two-oar two-rudder, diesel-powered tanker.
1.3.1 main cabin:
Ship is equipped with 7 water/oil transverse bulkhead, the # 29 ~ # 85 area is equipped with 1 oil and longitudinal bulkhead, from stern to bow rudder in clear water tank, engine room, aft cabin (fuel tank), № 3 cargo oil tank (or so), № 2 cargo oil tank (or so), № 1 cargo oil tank (install) of diesel and fore peak tank, storage tank, and.
1.3.2 main deck:
The stern line: set the stern mooring area, the passageway to the upper deck (the storage battery under the stairs);
# 8 ~ # 13 rib: monitoring room, kitchen, charge and discharge board, boiler room
您可能关注的文档
- 2010学年.文娱部上学期工作总结与下学期工作计划(国外英文资料).doc
- 2010年12月主要国家滞留船舶情况分析(国外英文资料).doc
- 2010年中考复习资料--汉字专题(国外英文资料).doc
- 2010年教职工迎新年文娱兴趣运动安排计划(国外英文资料).doc
- 2010年烛光纪念日宣传活动地方执行组织指南(国外英文资料).doc
- 2010暑假实践报告2(国外英文资料).doc
- 2010成人高考高起点历史真题及答案解析(国外英文资料).doc
- 2010生物竞赛(国外英文资料).doc
- 2010高考江苏卷地理试题(国外英文资料).doc
- 2011-2012学年第一学期文娱部工作规划1(国外英文资料).doc
- 四川省生态环境厅关于直属事业单位2025年下半年公开考核招聘工作人员备考题库及答案详解1套.docx
- 北控水务集团2026届校园招聘120人备考题库及答案详解一套.docx
- 2025福建省人力资源发展集团有限公司南平分公司招聘2人备考题库附答案详解.docx
- 2025重庆两江假日酒店管理有限公司招聘2人备考题库附答案详解.docx
- 2025浙江台州市椒江区专职社区工作者招聘38人备考题库及答案详解1套.docx
- 2025浙江金华市浦江县县属医疗卫生单位招聘优秀卫生专业技术人员76人备考题库附答案详解.docx
- 2025广东广州花都城投铁工建设工程有限公司招聘项目用工人员37人备考题库附答案详解.docx
- 宜宾新高人力资源服务有限公司关于2025年公开招聘员额制人员备考题库(69人)含答案详解.docx
- 2025广西南宁市“三支一扶”招募147人备考题库及答案详解一套.docx
- 2025战新产业“330”计划中国能建葛洲坝集团社会招聘330人公考前自测高频考点模拟试题附答案.docx
原创力文档


文档评论(0)