- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
分段施工方法(国外英文资料)
分段施工要领(国外英文资料)
Section 7 construction key
1 precision control requirement
Precision control of 1-1 tyre
Jig is the base of the segmented manufacturing tire rack is formally or not directly affects the quality of the segmentation, therefore, department of strict rules, jig made after the acceptance by the clinical laboratory.
1-1-1 must be rigid enough.
1-1-2 tyres are made with centerlines, angular lines and horizontal lines.
The tire rack installation dimensions is not greater than 1-1-3 block, if it is a general jig, must consider in the end section of strengthening, and consider the location of the rings, do the permanent design.
2 sections are underlined
After the flat plate of the 2-1 straightening section, it will also be fixed with the tire frame so as to avoid deformation, the longitudinal bone and the girder will use the steel belt to underline the condition of the condition permitting.
2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2-2 - It is required to draw the rib inspection line, the residual line and the right line, and the special person is responsible for the inspection and the record and archives.
3 section completed
After the completion of section 3-1, it is necessary to draw the rib inspection line, water line, centerline, straight line and section of the line, and then the foreign press.
3-2, when completed measurements must carefully check the segmented appearance size, welding deformation data, the type of value must be controlled within the scope of permissible error, error will be rework correction, not to cause process after the hidden danger, and the data archive, if necessary should be conveyed to berth.
The 3-3 inspection tool must be proofread regularly.
3-4 strictly implement the free side fire technique.
During the manufacturing process, the welding deformation can be divided into two processes
4-1 deformation on the rack. When the section is made on the shelf, the deformation occurs due to the welding between the components. At this
原创力文档


文档评论(0)