- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
刺墙尺寸设置(国外英文资料)
刺墙尺寸设置(国外英文资料)
Wall size setting (side wall winding simple calculation)
The water sluice chamber or the spillway barrier is encountered while retaining water or spillage. Lock chamber or follow spillway weir crest slab, the downstream side of the wall construction joint water is commonly used in seepage prevention treatment, if you can ensure no water flow from the construction joint and generally do not have to set up the wall, but the contractor if jerry, seepage of water stop material short of asks, then stab need to consider setting up a wall. The barbed wall usually takes the width of 0.3 ~ 0.4 m, and the length needs to be decided. According to the water lock, which is compiled by Chen baohua, the method of resistance coefficient is calculated. Here is a simple calculation of the wall of a spillway.
To check flood level condition to calculate (at this point, the downstream water level difference maximum), upstream reservoir 5 a once-in-a-century check flood level of 64.18 m, floor height of 58.2 m, spillway flow width of 13 m, through the trial, bottom downstream water depth of 60.50 m, and downstream water level difference as = 64.18-60.50 = 64.18 m. According to the introduction of the water lock, the length of the thorn wall can be 1 ~ 3 times, the lower water level difference, combined with the size of the proposed bridge, the length of the wall is 4 meters, and the detailed layout is shown in figure 1. The bridge is 14.14 m and the tooth wall is set in the middle of the bridge.
According to the floodgates, the side of the bridge is about half the length of the bridge, about 7.1 m (see figure 2). Because the wall is thinner (0.3 m wide), it can be reduced to the short plate pile calculation. The resistance coefficient of each section is carried out in accordance with the water brake design specification (SL265-2001). The screenshots are as follows:
Import and export section:
Internal vertical segments:
Internal level:
Figure 1 bridge and barbed wall arran
您可能关注的文档
- 公共基础第一章数据结构(国外英文资料).doc
- 全面加强湿地保护与恢复(国外英文资料).doc
- 公共排污管堵塞的责任到底属于谁(国外英文资料).doc
- 公园管理质量标准110117(国外英文资料).doc
- 公园茶室设计(国外英文资料).doc
- 公安专业重点温习.txt(国外英文资料).doc
- 公山湾防洪沉砂池淤泥、流砂清理施工方案(国外英文资料).doc
- 公摊系数、公摊率、公摊面积(国外英文资料).doc
- 公摊面积计算(国外英文资料).doc
- 公路安全生产隐患排查治理工作方案(国外英文资料).doc
- 2025浙江温州市公用事业发展集团有限公司面向高校招聘工作人考前自测高频考点模拟试题最新.docx
- 2025年蓬安县财政局下属单位招聘备考题库附答案.docx
- 广安市农业农村局2025年公开遴选市动物卫生监督所工作人员备考题库附答案.docx
- 南昌市劳动保障事务代理中心招聘3名劳务派遣驾驶员参考题库附答案.docx
- 2025浙江绍兴市新昌县机关事业单位招用编外聘用人员36人备考题库最新.docx
- 浙江国企招聘-2025嘉兴海盐县城市投资集团有限公司招聘7人笔试备考试题附答案.docx
- 长沙银行2026校园招聘备考题库最新.docx
- 2026年度中国地震局事业单位公开招聘备考题库附答案.docx
- 2025福建省晋江圳源环境科技有限责任公司招聘6人模拟试卷附答案.docx
- 浙江国企招聘-2025温州平阳县城发集团下属房开公司招聘5人公笔试备考试题附答案.docx
原创力文档


文档评论(0)