- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
办公楼装修工程完工仿单(国外英文资料)
办公楼装修工程竣工说明书(国外英文资料)
Weifang high and new development zone new town office building the construction of the construction project
First, the general situation of the project
JieBan weifang hi-tech development zone of new office building is located in weifang high-tech development zone, decoration area of XXX ㎡, points the two building, office building south tower belongs to the old building renovation (ground, metope, ceiling, etc.), north tower belongs to a new building under construction.
Second, the scope of the contract
Party a and b agree on the general outline of the decoration project, and the installation and decoration of water, electricity and heating.
Third, the contract method
Package cost is adopted in this renovation (except for materials, equipment, facilities), package quality, time limit, safe construction and civilization management mode of comprehensive contracting.
4, project construction itemized and technical specification
Tower:
1) the ground:
The ground and stair of the first floor corridor are made of natural granite with 1:3 hard cement mortar, 150
The wide jinan green string of 100 high and the material kick the leg line. The office adopts 800 * 800 high-grade full-glass ceramic tile match ratio is 1:3 hard cement mortar outfit, 100 high with material to kick foot line.
The floor of the second floor corridor adopts 800 * 800 high-grade full-glass ceramic tile matching ratio is 1:3 hard cement mortar pavement, 100 high with material to kick foot line. In the office, the ground floor is smashed by the cement self-flowing flat and the high grade composite wooden floor is made of PVC kick.
2) emulsioni paint: the whole floor of the whole building and the top of the top of the whole floor have eradicated the batch of grey and the three times that the putty was treated with the latex paint. White latex paint for the wall of the office wall.
3) a second floor corridor ceiling is used to handle 600 * 600 grid lamps with the light steel keel plate