基坑排水计划(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基坑排水计划(国外英文资料)

基坑排水方案(国外英文资料) Foundation pit drainage Field drainage Site excavation are often faced with hysteresis of groundwater and surface water infiltration in great quantities, cause flooding, endanger the stability of the slope, influence the construction, so must be prepared to live site drainage, water cut, hydrophobic, drain flooding, and minimize the rainy season construction work, processing method is: (1) the area around at the scene should set up a temporary or permanent drainage, FangHongGou or water retaining dam, slope location should be set at the top or at the foot of the slope annular FangHongGou or water drainage ditches, near to block rain, diving into the construction area. (2) the scene inside and outside the original natural drainage system as far as possible, keep or properly refit, hydrophobic, modification, or according to need to add a small amount of drainage, and stagnant water discharge field water, rain water and surface. (3) when the conditional, as far as possible use of formal engineering drainage system for construction service, first to build formal engineering main drainage and pipe network, convenient to eliminate stagnant water on the ground and groundwater excavation well point. (4) the road should be in a drain on both sides, the word should be on both sides of the small drainage ditch, ditch grade is commonly 2% ~ 8%, keep clear of site drainage and road. (5) the excavation of the foundation pit shall be excavated at the upstream side of the surface of the surface of the surface of the surface of the surface of the surface of the earth, where the water will be blocked by a drainage ditch, a drain or a cut of water, and the ground will be blocked by water. When digging a foundation pit in low-lying areas, the earth can be excavated from the soil along the sides of the earth or the side of the water. (6) the table of large area of water, can take cutoff ditches within the scope of construction section, to a vertical and horizontal draina

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档