建设单位拖延验收如何处理(国外英文资料).docVIP

  • 5
  • 0
  • 约3万字
  • 约 11页
  • 2017-05-27 发布于河南
  • 举报

建设单位拖延验收如何处理(国外英文资料).doc

建设单位拖延验收如何处理(国外英文资料)

建设单位拖延验收如何处理(国外英文资料) How does the construction unit procrastinate Shanghai yuanshi law firm li zongmeng In the practice of construction projects, the construction unit usually requires that the construction unit be about 60% ~ 70% of the total amount of the project. After the completion of the inspection, it will be roughly 80% to 85% of the finished product. After the completion of the settlement, the payment shall be 95% of the price of the settlement. In the terms of payment, a key condition is complete acceptance. If the construction unit funds nervous, some dishonest units often reluctant acceptance after project completion, hope that through late project delay acceptance to achieve. Examples of delayed acceptance are common. The contractors response is roughly divided into three steps. The first step is to check the contractor. Convenient for writing this article in the steel structure of the subcontract works, for example, general contracting project or other professional subcontractor can consult relevant self-examination), contractor inspection content includes: 1. The control drawings, whether drawing work content has been completed, whether the content of the construction conform to the requirements of the drawings, specification and standards. If exist in the construction process of the construction unit verbal instructions written change order without replacement, the contractor shall be immediately to the construction unit repair technology for approval sheet, please after the signing of the construction unit, design unit, supervision unit construction as the basis. According to the picture construction is the contractors legal liability. If there is no technical verification sheet, if there is a dispute, not only the part of the change is not counted, but the construction unit can be reversed. Whether the material meets the design requirements. The steel structure USES accessories such as hardware, bolts, etc. 4. The weld quality are ultrasonic flaw

文档评论(0)

1亿VIP精品文档

相关文档