建设工程消防设计备案抽查告知单(国外英文资料).docVIP

  • 31
  • 0
  • 约2.86万字
  • 约 10页
  • 2017-05-27 发布于河南
  • 举报

建设工程消防设计备案抽查告知单(国外英文资料).doc

建设工程消防设计备案抽查告知单(国外英文资料)

建设工程消防设计备案抽查告知单(国外英文资料) Set up schedule to eliminate the prevention and control of the report Welcome to fire window construction fire protection design for the record filing formalities, according to the newly revised hereby and the public security ministry make no. 106 construction of fire supervision and management regulations regulation, shall be dealt with in accordance with the following requirements, please. Thank you for your cooperation: The scope and procedures of the construction of the construction project fire protection design and filing: (a) of the public security ministry make specified in article 14, article 13, no. 106 is outside of the construction project, the construction unit shall obtain construction permits (or the examination and approval of construction scheme for design notice) within seven working days, by the provincial public security organ fire agencys web site ( into fire handle affairs hall) of the fire control design for the record to accept the system for fire control design for the record, or to submit the paper for the record table into the fire control design for the record by the public security organ fire control institutions to accept the system. (2) a random sampling procedure is set up in the system of fire control design and filing; After the record is completed, the system automatically generates the record certificate and informs whether it is determined to spot the target. The construction unit shall print and keep the certificate of record on its own. By spot check to the construction unit call the record on the voucher, determine the jurisdiction on record after five working days from the date of the public security organ that has jurisdiction over the fire control institutions to provide the following materials: Second, new construction and expansion of the design of fire protection design for the project shall provide the application materials that shall be provided: 1, construction project fire control design reco

文档评论(0)

1亿VIP精品文档

相关文档