- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
影响锚杆在沙区通过模型对隧道的稳定性试验和分析
Effect of rock bolts on tunnel stability in sandy ground through model
tests and analyses
H. Mashimo S.Morimoto
Public Works Research Institute, Tsukuba, Japan
ABSTRACT: In order to clarify the effect of rock bolts and the influence of the timing of installing rock bolts
in sandy ground, a series of tunneling model tests, simulated by a trapdoor apparatus, are carried out. The re-
sults show that rock bolts with a certain level of length have the effect of reducing the load on the trapdoor
and rock bolts installed after the occurrence of the loosened area have the similar effect as the rock bolts in-
stalled before the occurrence of the loosened area when the overburden is large. In order to verify the experi-
mental results, a numerical simulation by the FDM analysis is conducted using the cable elements. By calcu-
lating the settlement of the ground and load on the trapdoor, it is confirmed that the analytical results
reasonably explain the experimental ones.
1 INTRODUCTION model results.
In NATM, rock bolts play an important role to keep
the ground stability around a tunnel when the tunnel 2 TUNNELLING MODEL TESTS
is excavated in rock ground. But in case of a tunnel
2.1 Apparatus
excavated in sandy ground with shallow overburden,
rock bolts at the tunnel crown are sometimes omitted Figure 1 shows a schematic diagram of the apparatus
because the measured stress occurring in the rock used in this study. Trapdoor apparatus is used to
bolts installed at tunnel crown show compression measure the load acting on the trapdoor at the bot-
stress. In addition, sometimes rock bolts are installed tom of model ground with the trapdoor displace-
far apart from the tunnel face due to the difficult
您可能关注的文档
- 【一建】至尊课程 20160517 安国庆 一级建造师 建设工程法规级相关知识.pdf
- OpenCV for Windows Qt+Creator安装.pdf
- ISO22716标准(中英文对照).pdf
- 基于PLC控制机床搬运机械手的设计_陈华森.pdf
- 数据结构5-6章测试题(带答案).doc
- 旅游地乡村聚落用地格局演变的微尺度分析_河北野三坡旅游区苟各庄村的案例实证.pdf
- ArcGIS Engine的开发与部署培训资料.pdf
- CCS3.3下SEED-XDS560v2PLUS Configure File文件制作(Rev.A).pdf
- 小学英语三年级上册重点知识归纳.doc
- ISA-ES 简易配置手册.pdf
- 考虑剪胀角的节理化岩体隧道开挖进尺优化研究.pdf
- 大学体验英语听说1 unit2 ppt.ppt
- 12级本科及14专升本翻译2--颜色词.ppt.Convertor.doc
- 高水压富水区隧道限排衬砌注浆圈合理参数研究_张成平.pdf
- 地裂缝对地铁明挖整体式衬砌隧道影响机制的模型试验研究_黄强兵.pdf
- 概率论与数理统计-2.2随机变量函数的分布.ppt
- 专业英语词汇:机械加工.doc
- [NTNU地质与隧道]Lecture 5. Engineering geological investigations.pdf
- 煤矿超千米深部全断面岩石巷道掘进机的提出及关键岩石力学问题_刘泉声.pdf
- 古希腊罗马神话第一讲(中英双语).ppt
文档评论(0)