“WICKED PROBLEMS, RIGHTEOUS SOLUTIONS” BACK TO THE FUTURE ON LARGE COMPLEX PROJECTS ABSTR.pdfVIP
- 11
- 0
- 约3.68万字
- 约 12页
- 2017-06-03 发布于河南
- 举报
“WICKED PROBLEMS, RIGHTEOUS SOLUTIONS” BACK TO THE FUTURE ON LARGE COMPLEX PROJECTS ABSTR
“WICKED PROBLEMS, RIGHTEOUS SOLUTIONS”
BACK TO THE FUTURE ON LARGE COMPLEX
PROJECTS
Robert Lane 1and Graham Woodman2
ABSTRACT
Most large, long and complex projects are “Wicked” Problems. To deal with change and
uncertainty on such projects, the project Delivery Process (Definition, Design,
Manufacture and Assembly) needs to be considered with the Development Process
(Business case, statement of need, Functional Brief) as a total system. The Development
Process
您可能关注的文档
- 幽幽塞纳河,桥上好风光.pdf
- 简明法语教程上单词.pdf
- 法语1单词 -VoltMemo.pdf
- Open Problems in Parameterized and Exact Computation — IWPEC.pdf
- Problems in H div ω and H curl ω.pdf
- E8a 使用手册.pdf
- 马上和售后联系以后同意给我退换货.pdf
- The Role of Requirements Traceability in System Development”, The Rational Edge, September.pdf
- [世界报].Le.Monde.Livres.26.Mai.2006.pdf
- AA景观都市主义.pdf
原创力文档

文档评论(0)