安全专项施工方案(国外英文资料).docVIP

安全专项施工方案(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安全专项施工方案(国外英文资料)

安全专项施工方案(国外英文资料) The rules of building quality [2004] 213 are: Article 3 greater danger engineering means on the basis of the construction engineering safety production management regulations referred to in article 26 of the seven division component project, and shall be separately compiled before construction safety special construction scheme. (1) foundation pit support and precipitation engineering The foundation pit support project refers to the excavation of a foundation pit with a depth of more than 5m (5m) and the construction of a supporting structure; Or the pit is not more than 5m, but the geological conditions and the surrounding environment are complex and the water table is above the bottom of the pit. (2) earthwork excavation works The excavation of earthwork refers to the excavation of the ground pit, which is more than 5m (5m) deep. (3) template engineering Various kinds of tools type formwork, including sliding mold, climbing molds, large templates etc. Horizontal concrete component template support system and special structure template engineering. (4) lifting and lifting projects (5) scaffold construction The scaffold of a floor steel tube with a height of more than 24m; Attached scaffold, including overall ascension and fragmentation; Suspension scaffold; Door scaffolding; Scaffold; Scaffold for hanging baskets; Discharge platform. (6) demolition and demolition projects The use of artificial, mechanical demolition or demolition projects. (7) other dangerous projects The installation of the building curtain wall; Construction of pre-stressed construction; Construction of tunnel construction; Bridge construction (including Bridges); Construction of special equipment; Construction of the network frame and the cable membrane structure; The construction of the slope of the slope above 6mb; The diversion of the great river, the river, the intercepting construction; Port engineering and waterway engineering; The adoption of new technologies, new technol

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档