2012市政真题答案(国外英文资料).doc

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2012市政真题答案(国外英文资料)

2012市政真题答案 Individual choice questions (1, 20, 20) : Choice: gravity P42: the gravity retaining wall relies on the wall of the wall for the lateral thrust (earth pressure) to maintain the stability of the soil. Options: deformation The P5: (asphalt) : bearing capacity, flatness, temperature stability, anti-slip ability, water permeability and noise. Option: slow down quickly P16: the ground compaction principle: first light weight, first static, first low, first slow, then overlap. Choice: 40 percent of bending strength P36: after the concrete reaches the design bending strength 40%, the pedestrian can be allowed to pass. Option: the Angle of intersection is less than 60 degrees and should be equipped with a hanger or condole P68: when the hoisting is in place, the strength of the concrete should not be lower than that of the design requirement, which should not be less than 75% of the design strength. The strength of the mud should not be lower than the design requirement of the component, which is not less than 30MPa if the design is not required. P69: when the Angle of the sling and the hoisting member is less than 60 degrees, it should be set up with a suspension or lifting pole, and make it as perpendicular as possible. Option: set the height of the observation marks on the base board of the box P80: it is advisable to avoid the construction of rain, and if it is under construction in the rain, it must be good for flood control and rain and water drainage. When the top force reaches 0.8 times the box contains not started, the roof should be stopped immediately. P81: the height of the observation beacon is set up on a regular basis. Options: shield P90: in the soft aquifer, the ground structure is not allowed to be demolished, the construction conditions are difficult, and the shield construction tunnel can show its superiority. Option: the top displacement of the pit is the largest, the horizontal displacement of the foundation pit P101: when the shallow founda

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档