- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工组织设计施工项目总体规划及施工准备工作(国外英文资料)
施工组织设计施工项目总体规划及施工准备工作(国外英文资料)
Introduction to the first section of the construction plan
First, the main task of the construction plan
The construction plan is the comprehensive arrangement and the technical economic document that directs the construction, is the main basis of the guidance construction. The correct formulation and thorough implementation of the construction plan are the first conditions to ensure the smooth construction, and also the necessary technical organization measures in the construction of basic construction.
Construction planning is based on the construction project as the object, based on the contract request content, in guarantee period, quality, cost, etc required by the technical and economic indicators, making strategic deployment, major construction scheme and technical organization measures are proposed, with the optimum economic effect to complete the construction task.
The construction plan is also the main basis for the construction plan, the material supply plan, the labor optimization combination and the cost reduction. Due to the scale of the project, the characteristics of the structure, the requirements of the production process and the technical conditions of the construction, the depth and scope of the construction planning are different. But its main mission, its principles and its basis have much in common. The main tasks of the construction plan are:
To establish the most reasonable construction and procedure, and to put the project into production according to the contract requirement.
To adopt advanced and economically rational construction plans and technical organization measures,
Choose the most effective, economical construction equipment and labor organization,
Carefully calculate and consider the manpower, the material force, guarantee the equilibrium construction,
Set up the right project schedule and control through key lines.
Make reasonable arrangement in space and time in the field of construction, and do th
您可能关注的文档
最近下载
- 人教版数学试卷五年级下册期末测试题9.doc VIP
- 人教版道德与法治七年级上册知识点梳理(00002).docx VIP
- DBJ∕T 13-71-2021 回弹法检测混凝土抗压强度技术规程.docx VIP
- 新生儿低血糖临床规范管理专家共识.pptx VIP
- 三角函数 新高考数学知识点总结与题型精练(新高考地区专用).docx VIP
- 沪教版六年级上册数学练习题(最全).doc VIP
- 组织效能提升工作 坊 系统思考:如何破除组织防卫,提高组织效能.docx
- 《GB30000.27-2013化学品分类和标签规范第27部分:吸入危害》最新解读.pptx VIP
- 园林绿化养护台账.docx VIP
- 智慧医院智慧消防系统设计方案.docx VIP
文档评论(0)