LNG加气站BOG再液化工艺_吴晓南
2015 6 34 6
1000-8241 2015 06-0607-04
1. 610500; 2 052360
4 3
LNG BOG 110 m /d
LNG BOG HYSYS LNG
BOG BOG LNG
4 3
110 m /d LNG 1 BOG 1 BOG 1 BOG
1 1 BOG
LNG 90 kg/h BOG BOG LNG
BOGLNG BOG LNG
LNG 4710
LNG BOG HYSYS
TE89 A doi 10.6047/j.issn.1000-8241.2015.06.009
BOG reliquefaction process in LNG fi lling station
1 1 1 1 1 2
WU Xiaonan , HAN Xiaoyu , CHEN Liqiong , HUANG Kun , WU Shijuan , WU Yushuang
1. School of Petroleum Engineering, Southwest Petroleum University, Chengdu, Sichuan, 610500;
2. No.5 Oil Recovery Plant of PetroChinaHuabei Oilfi eld Company, XinjiHebei052360, China
Abstract: In order to reduce the environmental pollution and energy dissipation caused by direct BOG venting in LNG fi lling
4 3
station, taking the 1×10 m /d capacity of LNG fi lling station as an example, the BOG volume per day is calculated. BOG
reliquefaction process applied in this LNG fi lling station is simulated by HYSYS, and refrigeration grid is optimized step by
step. Then, the required LNG fl owrate for BOG reliquefaction in this station is calculated. For the LNG fi lling station, the
BOG reliquefaction can be realized with the addition of one set of BOG reliquefaction plant (including 1 BOG compressor, 1
BOG buffer tank, 1 recondenser and 1 pressure regulating valve). After parameters at each node of the process are adjusted,
when the LNG flowrate reaches 90 kg/h, BOG is condensated completely.
您可能关注的文档
- IDMA系统中基于SNR演进和差分进化的功率优化研究.pdf
- iData_浅谈烟气脱硫_赵镇魁.pdf
- IDC机房运行安全评测申报材料填写示例 - 租用运营商机房(提交版).pdf
- IEC 61557-2-2007 交流1000V和直流1500V以下低压配电系统电气安全 防护检测的试验、测量或监控设备 第2部分.pdf
- IEC 61557-5-2007 交流1000V和直流1500V以下低压配电系统电气安全 防护检测的试验、测量或监控设备 第5部分.pdf
- IEEE1588_协议中时钟同步_省略_影响因素以及时间戳的生成方式分析_陈永标.pdf
- IF钢对连续退火工艺的影响_张竑.pdf
- IGBT的NPT与PT工艺技术比_省略_NPT_IGBT模块的新封装概念_.pdf
- IGCC制氢发电装置净化单元工艺方案分析.pdf
- igbt门极参数Rg_Cge和Lg对IGBT开关特性的影响.pdf
原创力文档

文档评论(0)