- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑施工塔式起重机安装、使用、拆卸安全技术措施(国外英文资料)
建筑施工塔式起重机安装、使用、拆卸安全技术措施(国外英文资料)
Fourteen 、 tower crane safety technical measures
(1) the installation and disassembly of the tower crane shall be provided with the following personnel:
1,, who holds the certificate of safety production examination, is responsible for Mao Yongming, safety chief Yu Changhua, and mechanical management personnel Yu Yonggui.
2 with the construction of special operations qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.
3, tower crane has special equipment manufacturing license, product qualification certificate, manufacturing supervision and inspection certificate, and has been in the construction department for registration.
4, tower crane in line with the existing national standards tower crane safety regulations GB 5144 and tower crane GB/T 5031 relevant provisions.
5. Check the following items before tower crane is activated:
(1) documents such as registration and registration of tower cranes;
(2) operation qualification certificate of construction special operation personnel;
(3) special construction plan;
(4) the qualification certificate of auxiliary lifting machinery and operation personnel qualification certificate.
6. The technical archives of tower cranes shall be established, and the technical archives shall include the following contents:
(1) purchase and sale contracts, manufacturing licenses, product qualification certificates, manufacture supervision and inspection certificates, installation instructions and record evidence, etc.;
(2) regular inspection reports, regular self inspection records, regular maintenance records, maintenance and technical renovation records, operational failures and production safety accident records, cumulative operation records and other operational data;
(3) all previous installation and acceptance data.
7. Tower cranes in the following circumstances a
您可能关注的文档
最近下载
- 2023年河西学院药学《药理学》科目期末试卷A(有答案).docx VIP
- 2023年海南师范大学体育教育专业《普通心理学》期末试卷A(有答案).docx VIP
- 2024年国开电大本科《流通概论》单项多项选择题库(附答案).pdf
- 2023年海南师范大学地理科学专业《普通心理学》期末试卷A(有答案).docx VIP
- 精品解析:广东省广州市黄埔区2022--2023学年七年级下学期期末考数学试题(解析版).docx VIP
- 企业安全生产费用提取和使用管理办法(课件).pptx
- 系统接口对接实施方案.docx VIP
- 2023年海南师范大学物理学专业《普通心理学》期末试卷A(有答案).docx VIP
- 2021智慧树答案【思想道德修养与法律基础(山东师范大学)】智慧树网课章节测试答案 .doc
- 商汤科技上市招股说明书.pdf
文档评论(0)