- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
gageR
gage RR数据如何分析
Use Minitab for Gage RR analysis
The 2010-08-19 [
Use Minitab for Gage RR analysis
1. Prepare data
Before you do the analysis, prepare the worksheet. Data is the data in the table must be similar to the form below, there should be at least 3 columns, column is the serial number of parts, a column is the operators number or name, a column is the parts corresponding specific measurements.
There are two ways that Minitab can generate a worksheet like the one above,
1) create the Gage RR research worksheet, which generates data collection worksheets based on specific Gage RR research
2) import existing data - such as storing the old data in Excel spreadsheets
Create the Gage RR research worksheet
This feature is similar to a new worksheet. Through the menu to select the Stat Quality Tools Gage Study Create Gage RR Study Worksheet (statistical Tools Quality measuring tool Create Gage RR Study schedule)
Number of parts
Number of operators will enter the Number of operators
The Number of replicates inputs the Number of times each part is repeated
In the box under the Part Name and Operator Name, specify the Part number and Operator number or Name.
Here is the Chinese version of the operating interface
Generate a table similar to the figure below
They then measured the different numbered parts in the order of the RunOrder, and saved the results to C5.
Import existing data
If you used the Excel spreadsheet program to do Gage RR analysis, you need to import the data into Minitab first. For example, the table below
You can see that there are 10 parts, three surveyors, each measuring three times.
Because the data in Minitab is organized in columns, we have to do the data transformation first.
Start by copying and pasting the nine columns of data into the Minitab worksheet, similar to the image below
The data is then stacked up in the column by the Minitab stack. You can do this by stacking the Data, selecting the menu Data Stack Columns ( Stack, Columns)
您可能关注的文档
- 2015年专技人员公需科目培训(初级)测验4(国外英语资料).doc
- 2015年会计继续教育企业会计信息化工作规范考试及答案(国外英语资料).doc
- 2015年全国水利安全生产知识网络竞赛21245(国外英语资料).doc
- 2015年公需科目测验题(国外英语资料).doc
- 2015年各区一模试题分类汇编 - 依据情境 按请求写作(国外英语资料).doc
- 2015年专技人员公需科目培训(中、高级)考试(显示答案)(国外英语资料).doc
- 2015年微观经济形式与经济政策解读(上)谜底(国外英语资料).doc
- 2015年江西省中小学教员招聘测验纲目小学英语测验纲目(国外英语资料).doc
- 2015年浙江网上管帐继承教导谜底(国外英语资料).doc
- 2015年管帐继承教导中华管帐网校试卷及谜底(国外英语资料).doc
文档评论(0)