多层与高层建筑结构概念设计_风在跑(国外英语资料).doc

多层与高层建筑结构概念设计_风在跑(国外英语资料).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
多层与高层建筑结构概念设计_风在跑(国外英语资料)

多层与高层建筑结构概念设计_风在跑(国外英语资料) Research and practice of widening and lifting technology of double curved arch bridge Chen Jie King Group Jiangxi Communications Bridge Inspection reinforcement Co., Ltd., Nanchang 330038, China Abstract: This paper takes the Magang bridge as an example, and expounds the comprehensive reinforcement of the double curved arch bridge Use, such as carbon fiber cloth, anchor spray concrete, change the arch on the form of construction, outsourcing, concrete and so on. Key words: bridge engineering; double curved arch bridge; widening; carrying; comprehensive application 0 Preface Double arch bridge is a bridge in twentieth Century 60s the first light arcuated Mid Chinas Jiangsu province Wuxi County Bridge workers. Due to the erection of arch, wood saving, fast construction speed and the cost of steel less, this bridge appears rapidly across the country to get a large number of application. But because of the design load is low, and the hyperbolic arch arch, arch by wave, arch board and horizontal contact and combined according to a certain order, and the combination of rib and wave and plate surface is too small, the stress of the section of complex and poor integrity, resulting in 60 ~ 80s the construction of a large number of double curved arch bridge in the operation of the years after the emergence of different diseases are more serious security risks, can not meet the growing traffic demand. The arch bridge has a large potential overload, most of them after reinforcement and repair can continue to use, even after widening and set out to meet the design standards of higher. In this paper, a case study of how to make effective use of the double curved arch bridge is carried out with the industry as an example. Go Magang bridge (see Figure 1) is located at K2+250 (the new pile Xiuwu Highway No.), built in 1974. The upper structure consists of 2 span 40m equal section catenary, Vierendeel reinforced concrete double curved arch, and a semicircl

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档