- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大梁裂缝的原因分析及加固处理(国外英语资料)
大梁裂缝的原因分析及加固处理(国外英语资料)
Cause analysis and reinforcement treatment of girder cracks
Abstract: This paper analyzes the cracks of a project girder, and introduces the reinforcement and construction methods.
Key words: crack analysis of beam; QR type construction engineering; structural adhesive reinforcement; treatment
The comprehensive office building of a technical school in Henan, Xinxiang province is a six story brick concrete structure, in which the width of the classroom is 9.9m * 6.5m, the span of the girder is 6.5m, the beam height is 600mm, and the girders are all made of C25 on-site mixing concrete pouring. The project was put into operation in 1997, four years later, the four layer A - B the second and the third, fifth and the sixth axis, C - D, the second and the third five and six axis, five A - B, and on the bottom of beam and the beam axis beam side irregular longitudinal cracks and diagonal cracks, constitute a serious the hidden danger to the safety engineering.
Xinxiang construction quality supervision station, Xinxiang architectural design and Research Institute experts on-site investigation, reinforcement program proposed by our company for reinforcement construction. The reinforcement will be introduced.
1. scene investigation
The 11 frame girder beam bottom longitudinal maximum crack width of 0.8mm, seam depth of 30 - 50mm, the crack cut found beam bottom reinforcement rust phenomenon and local corrosion.
The 1.2 ends of the oblique beam the maximum crack depth of 20 joints was 0.5mm, 40mm, will crack scuttling, also found stirrup rust phenomenon.
1.3, according to verification, the main structure of concrete pouring concrete, coincides with the winter, the temperature is low, on-site mixing concrete mixed with chloride ion antifreeze, concrete related technical information is complete. After the quality inspection departments on the ten beams rebound, the beam concrete mark meets the design requirements.
The ten frame girder 1.4 cracks, especial
文档评论(0)