施工测量放样作业方法及要求(国外英文资料).docVIP

施工测量放样作业方法及要求(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工测量放样作业方法及要求(国外英文资料)

施工测量放样作业方法及要求(国外英文资料) The Yellow River holds the earth still, and the north wind and snow hate it. He that doeth evil shall die himself. The test of the stone shall be three days full, and the discernible shall stay for seven years. The teacher, therefore, the ministry of the ministry of the ministry of knowledge. Heaven and earth are in the dark. Construction survey lofting method and requirements of 22006-12 to 28 12:06 implement routine Settings: such as units, coordinate method, compensation mode, the types of prism, a prism constant, temperature, pressure, etc. 4. Use the total station with memory, can in advance to control points (including employs measurement sites, checkpoint) and lofting point coordinate data input device memory, and check. Four, the whole station coordinate method sets the station + the polar coordinate method puts a point Set up the whole station at the control point and complete the middle, and then check the Settings for the instrument: temperature, air pressure and prism constant. Input (enter) the 3d coordinates of the station, take and input the instrument high, input (adjust) the rear view coordinates, and then look after the sight. If there is a prism in the rear view point, the input prism is high enough to measure the coordinates and elevation of the view point immediately and check with the known data. Target another control point, check the azimuth or coordinates. At another known elevation point, a vertical prism or ruler examines the instruments high line of sight. When calculating the function of the instrument itself, the recorder should also carry out the correctness of the input data. Set up the rack and prism on the undetermined site, take, record and type the prism high, measure, record the coordinates and elevation of the fixed point. The above steps are to measure the site. Set up the station by step 1 on the site, and then check the coordinates and elevation of the other site. The recorder coordinates the distance a

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档