- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
油库油罐区管线改造管线方案(国外英文资料)
油库油罐区管线改造管线方案(国外英文资料)
TXT two people quarrel, first say sorry person, not admit defeat, do not forgive. Hes just more appreciative of the relationship than the other. This is a treasure I love to contribute
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
The project of pipeline engineering in the pipeline project in the reservoir area of the reservoir can be converted into the tank project
For oil depot, gasoline, diesel, industrial diesel oil pipeline project construction need, to the existing pipeline such as cutting, welding process in tank farm, in order to ensure oil depot construction quality, pipeline reconstruction scheme is established as follows: the transformation of pipeline, the main and the region will be 101, 102 tanks and 103, 103 cans of grid line merger, increase 1 6 middle gate valve, gate valve is closed to realize two kinds of oil each start function, gate opened down for the achievement of the tank when the tank, with the number 103, 104 cans of the existing gas pipeline grid instead of 90 # gasoline (Ⅱ) oil pipeline, should be in the old start opening barge receiving oil pipe line 2, the original oil pipeline as 0 # diesel oil pipeline, this tank farm does not increase the new pipeline 0 # diesel oil can be realized and no. 90 gasoline (Ⅱ) of receiving and departure function independently. From the no.108 can transfer pump room to the dock new DN150 receiving line, and the 108, 109, 110 can connect. Second, the pipelines transform the pipeline to transform the process
Prior to construction (1) to confirm whether the pipe has met the fire conditions. 1) chemical cleaning is done inside the pipe. After cleaning, the test will be used to test the fire conditions.
(2) fire prevention and explosion prevention measures in the vicinity of the pipe, and apply for fire work permit for the oil depot. Cover the oil pipe within 10 meters of the surrou
文档评论(0)